EcoHeat

EcoHeat

share
¥0.00
  • Detail
  • Parameters

Heating Water Washing tail gas (exhaust gas) treatment machine

It is our duty to protect environment

Equipment typeHeating water washing

Process:Exhaust gas is heating by high temperature then it would pyrolysis(600~800C°)It can soluble gas by water washing→Decreasing temperature and exhaust by water:It can be pyrolyzed or oxidized and the waste gas can be washed with water


Heat& Wet Gas Scrubber

u   2~3 Zone Heater Control

      -.Backup Function to Heater Fail

      -. LongLife Time Heater

u      Anti-clogging & Anti-corrosion Long Term MTBP & MTBF

      -. AirCurtain on boundary between Heating Chamber & Cooling Chamber   

      -.INCONEL600 Material   in Heating Chamber

      -.Teflon Coating in Wet Chamber

u    EasyMaintenance

      -.Reduce PM Time


1.png




SERIES
Thermal 電加熱
APPLICABLE
CVD, Diffusion適用
EQUIPMENT MODEL
EcoHeat-500
Price
¥0.00
CAPACITY
500, 1000slm